Dubai Shamal Substation
The scope of work for the Dubai Shamal 400/132 kV substation included engineering, supply, construction, installation, testing, and commissioning.
The substation, which was successfully energized on the 8th of April 2022, supported the environment by turning 40,000 m2 from a garbage dumping area into an alternate use. It has more than 1000 of piles with an average length of 22 meters per pile. Furthermore, its auxiliary is powered by solar energy and the substation is integrated with different global brands' electrical equipment.
Dubai Electricity & Water Authority
Engineering Construction
Dubai, UAE