Jeddah Reverse Osmosis Plant Phase III-240 MLD
This project included the complete civil work for the desalination plant in Jeddah, Saudi Arabia.
The scope of work is as follows:
1- Onshore Civil Work:
Site preparation, dewatering, piling, sheet piling, R.C.C. equipment, water channels, culverts, foundations, pipe works, and road paving.
2- Civil Work for Intake Rehabilitation:
Intake rehabilitation work consists of civil works like demolition, shoring, dewatering, earthwork, concrete work, coating and painting, joint work, steel and GRP, and paving.
3- Civil Work for Buildings:
Building works (27,764 M2) consist of earthwork, concrete and formwork, pre-engineered building, steelwork, masonry and plastering, floor finishing, wall finishing, ceiling and roofing, waterproofing and damp proofing, and work for windows, doors, and elevators.
Doosan
Engineering Construction
Jeddah, Saudi Arabia