Wasit Gas Plant
Alfanar Testing & Commissioning: Our scope of work included testing, pre-commissioning, and commissioning of the following:
- 230 kV substation including 21 bays
- Complete protection panels of the substation along with its remote end
- Power & auxiliary transformers with different ratings
- MV/LV switchgears
- MV/LV motor control centers (MCCs)